titel

by petr on March 11th, 2010
No notes
Syntax: No syntax
Show lines - Hide lines - Show in textbox - Download
  1. <Item> <OriginalName-ITM>8350399.dxf</OriginalName-ITM> <ConvertedName-ITM>8350399.dxf_viewed</ConvertedName-ITM> <SeqNum-ITM>1006</SeqNum-ITM> <Path-ITM>/Not
  2.  
  3. Not found/2/Converted</Path-ITM> <Type-ITM>2D CAD</Type-ITM> <ShowStatus-ITM>0</ShowStatus-ITM> <MarkOrNot-ITM>-</MarkOrNot-ITM> <DrawingNumber-
  4.  
  5. ITM>8350399</DrawingNumber-ITM> <Description-ITM></Description-ITM> <Qty-ITM/> <SellQty-ITM>1</SellQty-ITM> <ItemMass-ITM>0.03500000</ItemMass-ITM>
  6.  
  7. <PackHeight-ITM/> <PackBreadth-ITM/> <UnitPrice-ITM>26.31582000</UnitPrice-ITM> <Group-ITM>0001-ProductieGroep.txt</Group-ITM> <MasterMaterial-
  8.  
  9. ITM>P626</MasterMaterial-ITM> <CostPolicy-ITM>Contributing Cost</CostPolicy-ITM> <AssFiles-ITM> <File-ITM-AF>8350399.dxf-*?-*/Not Not found/2/Original-*?-
  10.  
  11. *Original</File-ITM-AF> </AssFiles-ITM> <CalcMetaData-ITM> <MatCalcType-ITM-CLC>Flat Plate Blank</MatCalcType-ITM-CLC> <Route-ITM-CLC>k s</Route-ITM-CLC>
  12.  
  13. </CalcMetaData-ITM> <Cost-ITM> <ResrcCode-ITM-CST>P626</ResrcCode-ITM-CST> <FixQty-ITM-CST>0.035</FixQty-ITM-CST> <CyclicQty-ITM-CST>0.041</CyclicQty-ITM-
  14.  
  15. CST> <UnitCost-ITM-CST>0.54</UnitCost-ITM-CST> <SupplierList-ITM-CST></SupplierList-ITM-CST> <Margin-ITM-CST>15.000</Margin-ITM-CST> <Description-ITM-CST>
  16.  
  17. (1 x 576 = 576 kg):Plaat 6000 x 2000 x 6</Description-ITM-CST> <SellPrice-ITM-CST>0.02523</SellPrice-ITM-CST> <TimeOrMaterial-ITM-CST>M</TimeOrMaterial-ITM-CST>
  18.  
  19. <RouteID-ITM-CST>m</RouteID-ITM-CST> </Cost-ITM> <CalcMaterialData-ITM> <Height>23</Height> <Breadth>32</Breadth> <ScrapPerc>15</ScrapPerc>
  20.  
  21. <YieldQty>1</YieldQty> </CalcMaterialData-ITM> <Cost-ITM> <ResrcCode-ITM-CST>L6050K</ResrcCode-ITM-CST> <FixQty-ITM-CST>1.58</FixQty-ITM-CST> <CyclicQty-
  22.  
  23. ITM-CST>0.550</CyclicQty-ITM-CST> <UnitCost-ITM-CST>100</UnitCost-ITM-CST> <SupplierList-ITM-CST></SupplierList-ITM-CST> <Margin-ITM-CST>15.000</Margin-ITM-
  24.  
  25. CST> <Description-ITM-CST>Klein Snijwerk L6050</Description-ITM-CST> <SellPrice-ITM-CST>4.08889</SellPrice-ITM-CST> <TimeOrMaterial-ITM-
  26.  
  27. CST>T</TimeOrMaterial-ITM-CST> <RouteID-ITM-CST>2000</RouteID-ITM-CST> </Cost-ITM> <Cost-ITM> <ResrcCode-ITM-CST>MANS</ResrcCode-ITM-CST> <FixQty-ITM-
  28.  
  29. CST>1.58</FixQty-ITM-CST> <CyclicQty-ITM-CST>0.550</CyclicQty-ITM-CST> <UnitCost-ITM-CST>45</UnitCost-ITM-CST> <SupplierList-ITM-CST></SupplierList-ITM-CST>
  30.  
  31. <Margin-ITM-CST>15.000</Margin-ITM-CST> <Description-ITM-CST>Manuren snijafdeling</Description-ITM-CST> <SellPrice-ITM-CST>1.83712</SellPrice-ITM-CST>
  32.  
  33. <TimeOrMaterial-ITM-CST>T</TimeOrMaterial-ITM-CST> <RouteID-ITM-CST>2000</RouteID-ITM-CST> </Cost-ITM> <Cost-ITM> <ResrcCode-ITM-CST>ZET4</ResrcCode-ITM-CST>
  34.  
  35. <FixQty-ITM-CST>10</FixQty-ITM-CST> <CyclicQty-ITM-CST>2.500</CyclicQty-ITM-CST> <UnitCost-ITM-CST>85</UnitCost-ITM-CST> <SupplierList-ITM-
  36.  
  37. CST></SupplierList-ITM-CST> <Margin-ITM-CST>15.000</Margin-ITM-CST> <Description-ITM-CST>Zetten 4 meter - 200 ton</Description-ITM-CST> <SellPrice-ITM-
  38.  
  39. CST>20.36458</SellPrice-ITM-CST> <TimeOrMaterial-ITM-CST>T</TimeOrMaterial-ITM-CST> <RouteID-ITM-CST>1000</RouteID-ITM-CST> </Cost-ITM> <CalcRouteData-ITM>
  40.  
  41. <RouteGroup> <RouteCode>k</RouteCode> <RoutePosID>1000</RoutePosID> <Value>Length-*?-*32</Value> <Value>Class-*?-*z</Value> </RouteGroup>
  42.  
  43. <RouteGroup> <RouteCode>s</RouteCode> <RoutePosID>2000</RoutePosID> <Value>Class-*?-*s</Value> <Value>Contour-*?-*s</Value> <Value>HoleDia-*?-
  44.  
  45. *3</Value> <Value>#Holes-*?-*3</Value> <Value>#Heads-*?-*3</Value> </RouteGroup> </CalcRouteData-ITM> </Item>

Leave a Reply

Note: XHTML is allowed. Your email address will never be published.

Subscribe to this comment feed via RSS